Respek Bali
ENIDRU

The island

An open disclosure standard for developers.

Ten fields, for one project and one phase, each with the document that proves it and the official place you can check it yourself. Respek Bali verifies nothing on this page and gives no badge.

Last checked 6 October 2026

Draft, under notary review

General information, not legal advice.

What this is

This is an open, voluntary disclosure form that a developer fills in for one project and one phase, and publishes on its own site.

Any developer can use it. Nothing requires a developer to publish it, and nothing stops one from doing so.

As a buyer, you can ask a developer for this disclosure before you pay anything, even if the developer has not published one yet.

Respek Bali checks nothing on this page, endorses no developer, gives no badge, and publishes no list of who uses it. The developer states the facts; you check them yourself, using the official sources below.

The ten fields

Ten fields, in order. The proof document backs the statement; the check column names the official system to test it yourself, where one exists. How to check a developer in these systems step by step: see the page “Checking a developer or seller”.

The ten fields
FieldWhat the developer statesProof documentWhere you can check
Project and phaseThe project name, its location or parcel, and which phase this disclosure coversNone. This page's own wording is the statementNo official check. Ask the developer whether other phases or projects exist
DeveloperLegal entity name and type (PT or PT PMA), NIB number, AHU registration numberDeed of establishment, SK AHU, NIBOSS (NIB) and AHU Online (name and address)
Land rightThe registered right (SHM, HGB, Hak Pakai or HPL), its certificate number and holder, or, for a lease, the lease term and who holds the underlying rightLand certificate, lease agreementBHUMI, ATR/BPN
ZoningKKPR or RDTR suitability, and that the land is not protected productive farmlandKKPR documentGISTARU, ATR/BPN
Building approvalPBG number, and SLF status (SLF exists only once the building is complete)PBG, and, if issued, SLFSIMBG
Completion and handoverCompletion date, PPJB and handover schedule, what happens on delay or cancellation, and whether the developer commits to a quarterly progress reportThe PPJB itselfNo official check. A promised quarterly report is its own ongoing check
Buyer's moneyWhich applies: a construction guarantee, staged payments, or neither, stated plainlyThe bank or non-bank letter of supportNo register exists. Ask to see the letter itself
Nominee and returns statementNo nominee arrangement, and no promised or guaranteed return. If a rental programme is offered, the operator's name, NIB and KBLINone beyond the statement itselfWaspada Investasi, OJK
Notary, PPAT and agentThe notary's and PPAT's names with working area, and, if an agent is used, the agency's NIB and the broker's competency certificate numberNone beyond the professionals' own registrationDaftar PPAT, ATR/BPN
Completed projectsThe developer's completed projects, each with its own PBG and SLF numbersNone beyond those numbersSIMBG
Field
Project and phase
What the developer states
The project name, its location or parcel, and which phase this disclosure covers
Proof document
None. This page's own wording is the statement
Where you can check
No official check. Ask the developer whether other phases or projects exist
Field
Developer
What the developer states
Legal entity name and type (PT or PT PMA), NIB number, AHU registration number
Proof document
Deed of establishment, SK AHU, NIB
Field
Land right
What the developer states
The registered right (SHM, HGB, Hak Pakai or HPL), its certificate number and holder, or, for a lease, the lease term and who holds the underlying right
Proof document
Land certificate, lease agreement
Where you can check
BHUMI, ATR/BPN
Field
Zoning
What the developer states
KKPR or RDTR suitability, and that the land is not protected productive farmland
Proof document
KKPR document
Where you can check
GISTARU, ATR/BPN
Field
Building approval
What the developer states
PBG number, and SLF status (SLF exists only once the building is complete)
Proof document
PBG, and, if issued, SLF
Where you can check
SIMBG
Field
Completion and handover
What the developer states
Completion date, PPJB and handover schedule, what happens on delay or cancellation, and whether the developer commits to a quarterly progress report
Proof document
The PPJB itself
Where you can check
No official check. A promised quarterly report is its own ongoing check
Field
Buyer's money
What the developer states
Which applies: a construction guarantee, staged payments, or neither, stated plainly
Proof document
The bank or non-bank letter of support
Where you can check
No register exists. Ask to see the letter itself
Field
Nominee and returns statement
What the developer states
No nominee arrangement, and no promised or guaranteed return. If a rental programme is offered, the operator's name, NIB and KBLI
Proof document
None beyond the statement itself
Where you can check
Waspada Investasi, OJK
Field
Notary, PPAT and agent
What the developer states
The notary's and PPAT's names with working area, and, if an agent is used, the agency's NIB and the broker's competency certificate number
Proof document
None beyond the professionals' own registration
Where you can check
Daftar PPAT, ATR/BPN
Field
Completed projects
What the developer states
The developer's completed projects, each with its own PBG and SLF numbers
Proof document
None beyond those numbers
Where you can check
SIMBG

Land right

Indonesian law names a limited set of registered rights to land, including Hak Milik, Hak Guna Usaha, Hak Guna Bangunan (HGB), Hak Pakai and Hak Sewa untuk Bangunan (Basic Agrarian Law, UUPA, Pasal 16).

A lease, hak sewa, is one of the rights that same list names, but it is a private contract between two parties, not a right recorded at the land office at the same level as Hak Milik, HGB or Hak Pakai. If a project is offered on a lease, ask which registered right sits underneath it, and how long the lease itself runs.

A project can also sit on Hak Pengelolaan (HPL), a management right rather than an ownership right. Ask which body holds the HPL underneath the project and on what terms.

  1. UU 5/1960 (UUPA) 30 September 2026

Zoning and building approvals

Since 2021, a project's land use has to be confirmed as matching the local spatial plan through a KKPR (Kesesuaian Kegiatan Pemanfaatan Ruang), under the spatial planning rules of Peraturan Pemerintah Nomor 21 Tahun 2021. Where a detailed local plan (RDTR) exists, the check is made against it.

Since 2026, Bali law also protects productive farmland directly: Perda Provinsi Bali 4/2026 prohibits converting Lahan Produktif to other uses, with narrow exceptions for national strategic projects, land acquired for public interest, and disaster relocation.

Building approval moved from the old IMB to a document called PBG (Persetujuan Bangunan Gedung). A separate certificate, SLF (Sertifikat Laik Fungsi), confirms the finished building is fit for use. SLF can only exist once the building is actually complete, so a project still under construction having no SLF yet is expected, not a red flag by itself.

  1. PP 21/2021 (spatial planning) 30 September 2026
  2. UU 6/2023 (Cipta Kerja, amending UU 1/2011 and UU 20/2011) 30 September 2026
  3. Perda Provinsi Bali 4/2026, JDIH Bali 30 September 2026

Completion, handover and delay

Before a house or apartment unit still under construction can be marketed at all, the developer must already hold a bank or non-bank construction guarantee. Before the PPJB (the preliminary sale agreement) can be signed, the land certainty, the issued PBG, and at least 20 percent of construction must also be in place (PP 12/2021, Pasal 22C and 22I).

The PPJB itself must state the schedule for construction, PPJB signing and handover, and what happens on delay or cancellation (PP 12/2021, Pasal 22F to 22L). If the developer misses its own disclosed schedule, the buyer can cancel and is owed a full refund within 30 days, with a penalty for each day the refund itself is late.

A quarterly progress report is not required by Indonesian law. It is a voluntary commitment under this standard: a developer that keeps publishing one is telling you something, and a developer that stops is telling you something too.

  1. PP 12/2021 (amending PP 14/2016) 30 September 2026

Where the buyer's money goes

Indonesian law does not require an escrow account for a project still under construction. Money paid at the marketing stage becomes part of the price; it does not have to sit in a separate account.

What the law does require is narrower: a bank or non-bank letter of support for the construction, held before any marketing (PP 12/2021, Pasal 22C), and a hard cap on how much the developer can draw down early: no more than 80 percent of the price before the PPJB's own conditions are met (Pasal 22L).

A developer that discloses neither a guarantee nor staged payments, and states plainly that neither exists, has still told you something real: no mechanism protects your money before completion.

  1. PP 12/2021 (amending PP 14/2016) 30 September 2026

Nominee arrangements and promised returns

Transferring Hak Milik land to a foreign beneficial owner through a nominee arrangement is void by operation of law: the land reverts to the state, and the foreign party cannot even claim back the money paid (UUPA, Pasal 26 ayat 2).

Bali's own Perda 4/2026 separately prohibits acting as an intermediary or facilitator for a nominee arrangement (Pasal 14). Its own sanctions are administrative, such as a written warning, a suspension or the revocation of a permit; the Perda refers any criminal liability to other legislation, not to itself.

Taking money in exchange for a promised, fixed return can amount to unlicensed deposit-taking under banking law (UU 10/1998, Pasal 46), whatever the arrangement is called. If a rental programme is offered alongside a project, ask for the operator's name, its NIB and its KBLI code, so you can check it like any other business.

  1. UU 5/1960 (UUPA) 30 September 2026
  2. Perda Provinsi Bali 4/2026, JDIH Bali 30 September 2026
  3. UU 10/1998 (amending UU 7/1992, Perbankan) 30 September 2026

Notary, PPAT and agent

PPAT, the land deed official, has a public, no-login register at atrbpn.go.id/daftar-ppat, searchable by land office. There is no equivalent public lookup for a notary; ask directly for their letter of appointment and their working area.

A property agency needs a business number (NIB) and a verified Sertifikat Standar, and every individual broker must hold a valid competency certificate; brokers without one and agencies licensed before PP 28/2025 had one year from 5 October 2025 to meet the standard, which ended on 5 October 2026 (Permendag 33/2025 Pasal 16(a); How to check a professional gives the detail). Under the same regulation, any online marketplace listing a property must show the agency's NIB and the broker's competency certificate number on that listing, though there is still no single public register you can search by the agent's own name.

  1. Daftar PPAT, ATR/BPN 30 September 2026
  2. Permendag 33/2025 30 September 2026
  3. PP 28/2025 (Pasal 132, 222, 223 and 549) 4 October 2026

The rules of this standard

This disclosure is written for one project and one phase. It says nothing about the same developer's other projects or other phases. Ask for a separate page for each one.

A brochure, a rendering, a legal opinion the seller's own lawyer wrote, a village letter, an NIB on its own, or the words application submitted do not replace this disclosure. See what does not count as this disclosure below.

Respek Bali verifies nothing on this page, endorses no developer, and gives no badge. It publishes no list of who uses this standard.

If a developer stops publishing its quarterly update, that itself tells you something. Respek does not chase a developer to keep publishing; the silence is the buyer's own signal to read.

What does not replace this disclosure

A sales brochure or a rendering, however detailed.

A legal opinion or due-diligence letter commissioned by the seller's own lawyer or notary; it was not obtained by or for you.

A desa adat letter or a banjar payment receipt. This is a real, often-practised custom, but it is not a government permit.

An NIB on its own, without the project's own KKPR, PBG and SLF.

The words application submitted or in process, for a PBG, SLF or KKPR. None of these carry weight until the document is actually issued.

A promise of returns made by message or in conversation.

How to use this

If you are a developer: fill in the template at respekbali.com/disclosure-template/, one form per project and phase, and publish it on your own site. Update it at least every quarter.

If you are a buyer: ask for this disclosure before you pay anything, including a deposit. Do not take the developer's word for the checks; use the official sources above yourself.

One open point: the pre-sale rules in PP 12/2021 are written for houses and apartment units sold before completion. Whether they also cover a villa sold on a lease is a real, unresolved question. Ask your own notary how it applies to your specific deal.